![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
Extruder Rebuilding
Criteria A used extruder is first completely disassembled and steam cleaned. All gearbox shafts are inspected for wear and concentricity.
Main thrust bearing is inspected and replaced if necessary. Main bull gear is inspected and turned 180 degrees. All new lubrication filter and plumbing are installed on the gearbox. The gearbox is reassembled with new sealant and bearing shims to original axial tolerances. Rebuilt or new feed throat section is installed. New barrel with a customer specified bi-metallic liner is installed and aligned with feed section and gearbox. Cast aluminum heaters are tested and replaced as necessary. New blowers and blower motors are installed. Head clamp, including shear pins, is inspected and repaired as necessary. New over pressure RUPTU Most extruder rebuilds are accompanied with other line components like rebuilt payoffs, preheaters, accumulators/dancers, capstans - dual wheel, belt wrap or caterpuller type and single or dual reel take ups. In all instances, new drive and temperature control panels are built in-house to customer specified drives which can be AC Vector or Digital DC. Panel logic can be either PLC (programmable logic control) controlled or PC based. Discreet temperature instruments or touch screen front end can be installed as per customer requirements. All electrical drawings are prepared in Autocad format, and provided on disk. |